Development of Design and Cost Estimate Documentation for an Irrigation Pipeline in the Artsvakar District of Gavar City
Development of Design and Cost Estimate Documentation for an Irrigation Pipeline in the Artsvakar District of Gavar City
Client: Gavar Municipality
As part of this project, it was planned to construct an irrigation pipeline using polyethylene pipes, with steel outlet pipes to ensure reliability during frequent connections and disconnections of flexible hoses by residents.
To facilitate future system expansion and simplify management, the design preserved an existing valve at the junction of the new and old pipelines, relocating it into a newly constructed inspection chamber.
At key pipeline junctions, the project included:
Per the municipality, there would be irrigation periods during which the pump’s discharge would need to be regulated and delivered through the newly designed pipelines to ensure effective field irrigation.